Projects

Project Detail

Center Elementary School

New Grade 2–4 Facility | Tewksbury, Massachusetts

Through an extensive evaluation process, the community selected a preferred solution to construct a new 790-student elementary serving grades 2 through 4 on the campus of the existing Ryan Elementary School.  This district wide approach brings students together early in their academic careers, minimizing transitions between grade levels, and facilitating a shared class identity.  Upon completion of fourth grade, students will move into the adjacent Ryan School on the same campus.  Additionally, with this option the district will be taking two aging facilities offline and alleviating over-crowding issues at two other schools.   

 A welcoming curved entrance to the school with generous seating options encourage informal interaction between students, staff, parents, and all members of the school community. A variety of right scaled outdoor gathering spaces, both interior courtyards and exterior to the school allow for outdoor classroom and social events.  The shared plaza, curved pathway system and subtly raised planted areas with native plantings create the appearance of a lush campus linking the 2 schools while allowing for more interaction and learning opportunities.  

 

The three-story school is organized around a centrally located outdoor classroom with classroom wings radiating outward into the landscape.  Enrichment spaces such as Art, STEAM Labs with green houses, and Music activate the outdoor classroom throughout the day.  The community visioning sessions emphasized the need of outdoor learning, gardens, green house space and accessible green roofs reflecting Tewksbury’s rich history of horticulture.  

A new athletic stadium replaced the historic Doucette Field, and is used for multiple sports at all grade levels throughout the school district, along with community use. The project also included the construction of a new field house with lockers, training spaces, and a fitness center.

Time Span 2023
Type New Grade 2–4 Facility
Client Tewksbury Public Schools
Size 139,500 square feet (school); 9,000 square feet (field house concession); 2,000-seat stadium
Cost $78.8 million
Design Team Kent Kovacs, Principal-in-Charge; Bill Beatrice, Project Manager
Consultants Nitsch Engineering (Civil Engineering); Engineers Design Group (Structural Engineering); Bala Consulting Engineers (HVAC Engineering); Crosby | Schlessinger | Smallridge (Landscape Architecture); PM&C (Cost Estimating)
General Contractor Consigli
Photographer Robert Benson

Related Projects

Bourne Intermediate School

New Grade 3–5 Facility | Bourne, Massachusetts

J.F.K. Elementary School & Holbrook Middle-High School

New Combined PK–12 Facility | Holbrook, Massachusetts

Freeman-Kennedy School

New Grade 3–6 Facility | Norfolk, Massachusetts

Morey Elementary School

New PK-4 Facility | Lowell, Massachusetts